Categories | Question details Back To List | ||
DHTMLx Scheduler - Event Re-size When dragging an event within a given day, the calendar re-size logic is not completely effective. Instead of expanding to take up the entire proportional width, it instead takes on the width of the elements which expanded to fill it's old location. For example: 1) Create 4 adjacent events (all 11am-1pm) 2) Drag the first of the newly created events to the 7am time slot on the same day. (so it no longer overlaps) 3) The event which was dragged will only take up 1/3 of the total column width. Answer posted by Alex (support) on Nov 09, 2009 08:26 Hello, the issue is confirmed. We will send the fix when it is ready. Answer posted by Tom on Jan 08, 2010 11:31 Was this issue fixed? Answer posted by Stanislav (support) on Jan 12, 2010 09:31 The issue was fixed in scheduler 2.1 |